0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Yes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaborationJoin our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessBuild-Operate-Transfer (BOT) contracts have been widely implemented in developing countries facing budget constraints. Analysing the expected variability in project viability requires extensive risk analysis. An objective analysis of various risk variables and their influence on a BOT project evaluation requires study and integration of many scenarios into the concession terms, which is complicated and time-consuming. If the process of negotiating the financial parameters and uncertainties of a BOT project could be automated, this would be a milestone in objective decision-making from various stakeholders’ points of view. A soft computing model would let the user incorporate as many scenarios as could be provided. Extensive risk analysis could then be easily performed, leading to more accurate and dependable results. In this research, an artificial neural network model with correlation coefficient of 0.9064 has been used to model the relationship between important project parameters and risk variables. This information was extracted from sensitivity analysis and Monte Carlo simulation results obtained from conventional spreadsheet data. The resulting consensus would yield to fair contractual agreements for both the government and the concession company.
Neda Shahrara, Tahir Çelik, Amir Gandomi (2016). Risk analysis of BOT contracts using soft computing. Journal of Civil Engineering and Management, 23(2), pp. 232-240, DOI: 10.3846/13923730.2015.1068844.
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Article
Year
2016
Authors
3
Datasets
0
Total Files
0
Language
English
Journal
Journal of Civil Engineering and Management
DOI
10.3846/13923730.2015.1068844
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access