0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Yes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaborationJoin our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessThis study aims to investigate the effect of cement replacement with high volume fraction of ground granulated blast furnace slag (GGBFS) and cement kiln dust (CKD) on mechanical, durability and microstructural properties of cement mortar from 1day to 550 days. Compressive strength and ultrasonic pulse velocity (UPV) were used to evaluate the mortars' performance. Besides, statistical analyses were conducted to predict mortars' mechanical and durability performance as well as investigate the influence of mortars’ properties (mixture and curing time) on their performance. The results indicated that replacing the cement with up to 60% GGBFS and CKD showed a comparable behavior to the cement after 28 days of curing onward. The statistical analysis revealed that the developed models achieved high level of agreement between the predicted and observed results with a coefficient of determination (R2) of more than 0.97. The findings in this study announced on the development of promising binder that can be used in different construction sectors with the benefits of reducing the CO2 emissions.
Ali Shubbar, Hassnen Jafer, Muhammad Abdulredha, Zainab Al-Khafaji, Mohammed Salah Nasr, Zainab Al Masoodi, Monower Sadique (2020). Properties of cement mortar incorporated high volume fraction of GGBFS and CKD from 1 day to 550 days. Journal of Building Engineering, 30, pp. 101327-101327, DOI: 10.1016/j.jobe.2020.101327.
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Article
Year
2020
Authors
7
Datasets
0
Total Files
0
Language
English
Journal
Journal of Building Engineering
DOI
10.1016/j.jobe.2020.101327
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access