0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Yes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaborationJoin our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessAccess to electricity is a key indicator of a country's development. In developing nations like Ethiopia, this metric is particularly crucial for assessing progress. Currently, about 45.8% of Ethiopia's population lacks access to electricity, with rural areas experiencing even higher rates, reaching 57.2%. The Southern Nations, Nationalities, and People's (SNNP) region faces the greatest challenge, with 62.1% of its population lacking electricity. Ethiopia aims to achieve universal electricity access by 2030, and microgrid (MG) development is expected to play a pivotal role in meeting this goal. This study employs a multi-tier framework (MTF) to categorize village households based on electricity access, considering factors like income level and willingness to pay, to support the MG development process. Three villages-Toba, Koza, and Womba-in the SNNP region were selected for optimal MG sizing. Sensitivity variables such as global horizontal irradiance (GHI) variation, photovoltaic (PV) and battery prices, battery usage limits, and capacity shortage levels were analyzed for their impact on net present cost (NPC), initial capital cost, and cost of energy (COE) using HOMER Pro software. For example, in the Toba MG, increasing the capacity shortage from 0 to 10% reduced the COE from 0.1195 $/kWh to 0.09104 $/kWh, a 23.82% decrease. Additionally, fluctuations in PV and battery prices had a direct impact on the system's NPC. The study also explored the impact of clustering the microgrids by interconnecting the three individual systems and conducting a techno-economic analysis. The comparison between standalone MG operation and clustered microgrids revealed that, despite the added cost of interconnection, the benefits in terms of technological, economic, and reliable operation of the clustered system were comparable to standalone microgrids. Finally, a feasibility study was conducted for the potential grid extension of the Toba MG, which is located 130 km from the nearest substation in Sawla.
Baseem Khan, Mohamed Ali Zdiri, Josep Maria Guerrero, Sanjay K. Chaudhary, Juan C. Vasquez, Gibran David Agundis Tinajero (2024). Optimal planning and sizing of microgrid cluster for performance enhancement. , 14(1), DOI: https://doi.org/10.1038/s41598-024-75906-z.
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Article
Year
2024
Authors
6
Datasets
0
Total Files
0
Language
en
DOI
https://doi.org/10.1038/s41598-024-75906-z
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access