Yes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaboration0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Join our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessThis research examines the beneficial contributions of project management to manage the cost and schedule of construction projects providing higher accuracy and reliability levels. The study depended on two main research approaches quantitative (online survey questionnaires) and qualitative (interviews) research techniques. The questionnaires and interviews aim to predict the importance of BIM technology in managing the cost and schedule of construction projects. Also, a third research method is employed, which represents a case study of a building, to make a comparison in terms of accuracy, effort, and budget of quantity take-off between manual (hand calculations) and numerical (REVIT Software estimations) approaches. The results revealed that adopting project management principles could significantly cut considerable budget, time, and effort to execute and complete construction projects. Also, project management is vital to prevent any financial losses or resource problems resulting from cost overruns or delays. Moreover, the results indicated that using modern project management techniques (including BIM technology and REVIT Software) could support engineers and project managers calculate the cost and schedule of their projects more accurately, avoiding errors. Besides, the results confirmed that using the REVIT software could aid project managers and civil engineers in evaluating the budget and time required to accomplish the construction project with less effort, time, and cost and provide a lower number of human errors compared with hand calculations. It was found that the manual and numerical results are greatly approximate to each other. Still, the results of the REVIT software offered more significant precision because of the accuracy in the modeling and the few engineers' mistakes in calculating quantities manually.
Roa'a Abdulwahhab, Sepanta Naimi (2022). Managing Cost and Schedule Evaluation of a Construction Project via BIM Technology and Experts' Points of View.. Mathematical Modelling of Engineering Problems, 9(6), pp. 1515-1522, DOI: https://doi.org/10.18280/mmep.090611.
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Article
Year
2022
Authors
2
Datasets
0
Total Files
0
Language
English
Journal
Mathematical Modelling of Engineering Problems
DOI
https://doi.org/10.18280/mmep.090611
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access