0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Yes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaborationJoin our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessIn this paper, using the so-called parallel space-time Markov chain (PSTMC) framework we analyze the IEEE 802.11 Distributed Coordination Function (DCF) frame service time, jitter, and queuing delay in a single-hop non-saturated wireless network. PSTMC framework provides the possibility of simultaneous modeling of backoff and post-backoff procedures, in addition to the transmission queue status of a non-saturated 802.11 station. To the best of our knowledge, the presented contribution is the first analysis of service time, i.e., access delay and retransmission delay, plus queuing delay at the same time, when the precise modeling of binary exponential backoff (BEB) scheme in medium access control (MAC) layer is the main issue of concern. The model is validated by extensive simulations, showing its remarkable level of accuracy.
Kaveh Ghaboosi, Matti Latva-aho, Yang Xiao, Babak Hossein Khalaj (2008). IEEE 802.11 Distributed Coordination Function service time and queuing delay analysis using Parallel Space - Time Markov Chain. , pp. 1-5, DOI: 10.1109/pimrc.2008.4699576.
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Article
Year
2008
Authors
4
Datasets
0
Total Files
0
Language
English
DOI
10.1109/pimrc.2008.4699576
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access