0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Join our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessYes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaborationChanges at different phases of a construction project are inevitable due to a multitude of reasons such as design changes, design errors, additions to scope, or unknown conditions that may arise due to resource limitations and the uniqueness of the project. For each change, contractors are entitled to an equitable adjustment to the base contract price and schedule. It is commonly accepted that change orders can have adverse effects on project performance, but these effects are difficult to quantify and manage, and they frequently lead to disputes. Most work in change order management focuses on labor productivity and does not pay as much attention to the quantification and management of the impact of change orders in regard to overall project performance in terms of time and cost. This paper describes a prototype expert system named QUICOPP that implements these ideas. The knowledge used in the system was acquired through a questionnaire survey administered to the contractors in North Cyprus construction industry. A list of factors that describe the adverse effects of change orders on project performance have been identified based on the survey, and this list of factors was used to develop a quantitative model of how different change orders affect the time and cost of a project. Our system provides a cost-effective means for handling change orders through all phases of a project such that construction operations can continue with the least amount of interruption that usually results from of disputes between different parties involved in a project.
İbrahim Yitmen, Hüseyin Sevay, Cem Taneri, Hakan Yalçıner (2006). An expert system for quantifying the impact of change orders on project performance. ICCCBE-ICCC-ASCE-DMUCE-CIB-W78-W102 joint international conference on computing and decision making in civil and building engineering, 06 April 2006, Montreal/Canada, pp. 1605-1613, International conference
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Conference paper
Year
2006
Authors
4
Datasets
0
Total Files
0
Language
English
Conference
ICCCBE-ICCC-ASCE-DMUCE-CIB-W78-W102 joint international conference on computing and decision making in civil and building engineering
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access