0 Datasets
0 Files
Get instant academic access to this publication’s datasets.
Yes. After verification, you can browse and download datasets at no cost. Some premium assets may require author approval.
Files are stored on encrypted storage. Access is restricted to verified users and all downloads are logged.
Yes, message the author after sign-up to request supplementary files or replication code.
Join 50,000+ researchers worldwide. Get instant access to peer-reviewed datasets, advanced analytics, and global collaboration tools.
✓ Immediate verification • ✓ Free institutional access • ✓ Global collaborationJoin our academic network to download verified datasets and collaborate with researchers worldwide.
Get Free AccessPurpose The purpose of this paper is to investigate the practice of stakeholder engagement as a social network dynamics for stakeholder satisfaction and project success in the lifecycle of mega transport infrastructure projects (MTIPs). Design/methodology/approach Hypotheses indicating the positive relationships between stakeholders’ effective attributes, stakeholder engagement as social network dynamics and project success through stakeholders’ satisfaction have been developed. Based on a questionnaire survey and semi-structured interviews, responses have been gathered from the representative groups and organizations on their social network dynamics for their satisfaction and project success. A hypothesized structural equation model has been tested using AMOS statistical software package. Findings The analysis highlighted the engagement of the stakeholders within the strategic intents of the project with the public needs and expectations. The model depicts the processes of building social network models based on the capturing of the project’s data in relation to the stakeholders’ communication and satisfaction across the key issues for success in the lifecycle of MTIP. Practical implications The model is applicable on most MTIP with a diverse stakeholder base and the underlying complexity associated with the community participation and consultation processes. The model will also support wider stakeholder engagement in the planning of MTIP with optimal operationalization and service delivery from a community perspective. Originality/value The research involves an approach for rationalizing the stakeholder engagement policies of the MTIPs by providing an empirically grounded model simultaneously linking various aspects of stakeholder effective attributes, stakeholder engagement and their relationships to stakeholder satisfaction and project success in MTIPs.
Mehmet Erkul, İbrahim Yitmen, Tahir Çelik (2019). Dynamics of stakeholder engagement in mega transport infrastructure projects. International Journal of Managing Projects in Business, 13(7), pp. 1465-1495, DOI: 10.1108/ijmpb-09-2018-0175.
Datasets shared by verified academics with rich metadata and previews.
Authors choose access levels; downloads are logged for transparency.
Students and faculty get instant access after verification.
Type
Article
Year
2019
Authors
3
Datasets
0
Total Files
0
Language
English
Journal
International Journal of Managing Projects in Business
DOI
10.1108/ijmpb-09-2018-0175
Access datasets from 50,000+ researchers worldwide with institutional verification.
Get Free Access